Overview
Site Engineer – BAM Nuttall
Full Time
Location: Dounreay, Thurso
Salary: Competitive, DOE
Role Family: Construction Management
Business Area: Engineering & Construction Management
Purpose: To promote and deliver civil engineering excellence as part of the civil engineering team.
Qualifications & Experience
The following are mandatory requirements:
- Degree, HND in Civil Engineering or equivalent NVQ Level.
- CSCS Level – Academically or Professionally Qualified Person/Supervisory/Manager.
The following are desirable requirements:
- Successful experience at Assistant engineer level.
- Working towards achieving ICE Technician or Incorporated (preferred) level or equivalent.
Accountability
Being personally accountable to your Line Manager for:
- Delivering on the responsibilities as set out below.
- Adopting and promoting BAM Nuttall’s Vision and Values.
- Taking ownership for the work assigned to you.
Responsibilities
Being personally responsible for:
- Communicating effectively at all levels including site management, technical specialists, commercial staff, planners, engineers, supervisory staff operatives, suppliers, third parties and client representatives.
- Maintaining high personal standards in health and safety.
- Monitoring the work and ensuring adoption of Beyond Zero and Don’t Walk By initiatives.
- Maintaining high standards in environmental awareness and behaviour.
- Driving quality delivery through effective planning and right first time delivery.
- Supervising and mentoring assistant, trainee engineering and technician staff.
- Monitoring and recording delivery against the agreed programme and construction methods.
- Maintaining good working relations with client, designer, supply chain and others.
- Making sure that the drawings and specification documents contain sufficient, accurate information for construction of the works before commencement.
- Formally requesting any missing information in sufficient time to meet the programme.
- Ensuring that works are accurately and clearly set out before work commences.
- Confirming by recording in writing, on the same day, any verbal instructions received from the client / designer / clients representative.
- Ensuring that comprehensive records of resources employed on all works are maintained.
- Ensuring that Inspection and Test Plans and checklist are in place and followed at the appropriate stages.
- Completing daily diary records and ensuring they are also being maintain by others under your supervision.
- Assist in preparing “look ahead” programmes in conjunction with the supervisory staff, coordinated with overall site programme.
- Assist in monitoring and reporting progress against “look ahead” programmes.
- Prepare written risk assessments and activity plans for the control of the works.
- Ensuring written risk assessments and activity plans/method statements are in place prior to works commencing.
- Ensuring that COSHH assessments are in place for materials to be used and that the requirements are being followed.
- Identifying, recording and reporting change to the scope of works or programme.
- Ensuring that testing / sampling of materials is carried out as required by the specification.
- Recording and reporting Non Conformances and ensuring appropriate corrective action is taken.
- Ensuring materials and workmanship meet the specification and maintaining appropriate records and proofs.
- Ensuring work records are being kept and in line with the project requirements.
- Contributing to the monthly and quarterly commercial forecast and reporting for your section of works.
- Provide accurate setting out for works before work is programmed to commence, allowing time for independent checking.
- Arrange formal checking of setting out and ensure check request form is completed.
- Ensure that material delivery tickets are passed to the section engineer for cost coding.
- Carry out testing / sampling of materials as required by the specification.
- Carry out site measures for control and ordering of materials.
- Take receipt of materials and check description, quantity, markings and condition before signing for receipt.
- Ensure that comprehensive records of all resources employed on additional works are maintained and submitted for signature within 24 hours of the work being carried out.
- Complete Observation cards if you observe something unsafe, damaging environment or good enough.
BAM Nuttall Values
Value Statement
- Predictable Performance: I deliver what I promise.
- Proactive Ownership: I take initiative to prevent, rather than fix.
- Scalable Learning: I ask, listen and support, so that we learn collectively.
- Open Collaboration: I share, so we all gain.
How To Apply
Please send your CV to maia.turkington@bam.com.